This checklist helps buyers prepare a clearer RFQ for copper water jackets and furnace cooling panels.
- Confirm furnace area, drawing revision, channel layout, connection locations, plate thickness, and mounting holes.
- Describe material preference, failed-part photos, working environment, and replacement reason.
- State inspection expectations such as dimensional review, visual check, pressure check, and packing requirements.